<item>
<title><![CDATA[E&amp;FM Yard Workshop Gents Toilet (051) - Interior construction works - 14th-16th September 2026.]]></title>
<description><![CDATA[<h3>Description of the Works</h3>
<p>E&amp;FM Yard Workshop Gents Toilet (Next to Dan Coe office.)</p>
<p>The university is carrying out interior construction works in the E&amp;FM yard commencing 14<sup>th</sup> September 2026 (duration 2days).</p>
<p>As part of these works, temporary interruptions to the lighting supply in the workshops, toilets &amp; offices. This may include the lighting serving the communal corridors and circulation areas immediately outside Dan&rsquo;s office.</p>
<p>Occupants are therefore advised to expect possible intermittent disruption to lighting during the works and to take appropriate care when using affected areas.</p>
<p>Every effort will be made to minimise disruption and restore normal lighting operation as soon as practicable.</p>
<p>We apologise for any inconvenience caused and thank you for your patience and cooperation while these works are undertaken.</p>
<p><strong>TIMESCALE</strong></p>
<p>14th-16th September 2026.</p>
<h3>How can I get more information and help?</h3>
<p>The Estates and Facilities Management team member looking after the task is detailed below and can be contacted about any difficulties experienced because of these works.</p>
<p>Name and Job Title: Spencer Aryeetey, Building Fabric Surveyor</p>
<p>Mobile: 07977 004475</p>
<p>Email: &nbsp;s.aryeetey@lboro.ac.uk</p>
<p>&nbsp;</p>]]></description>
<link>http://www.lboro.ac.uk/services/fm/campus-works-updates/listing/2026/efm-yard-gents-toilet---interior-construction-works---14th-16th-september-2026.html</link>
<guid isPermaLink="true">http://www.lboro.ac.uk/services/fm/campus-works-updates/listing/2026/efm-yard-gents-toilet---interior-construction-works---14th-16th-september-2026.html</guid>
<pubDate>Fri, 11 Sep 2026 14:10:00 GMT</pubDate>
</item>



<item>
<title><![CDATA[NCSEM Building (210) - Interior construction works - 14th-16th September 2026.]]></title>
<description><![CDATA[<h3>Description of the Works</h3>
<p>NCSEM Building _ Next to academic office 210.2.10</p>
<p>The university is carrying out interior construction works in the NCSEM building on behalf of Tony Goodall commencing 14<sup>th</sup> September 2026 (duration 2days).</p>
<p>As part of these works, temporary interruptions to the lighting supply on the second floor may occur. This may include the lighting serving the communal corridors and circulation areas immediately outside the offices.</p>
<p>Occupants are therefore advised to expect possible intermittent disruption to lighting during the works and to take appropriate care when using affected areas.</p>
<p>Every effort will be made to minimise disruption and restore normal lighting operation as soon as practicable.</p>
<p>We apologise for any inconvenience caused and thank you for your patience and cooperation while these works are undertaken.</p>
<p><strong>TIMESCALE</strong></p>
<p>14th-16th September 2026.&nbsp;</p>
<h3>How can I get more information and help?</h3>
<p>The Estates and Facilities Management team member looking after the task is detailed below and can be contacted about any difficulties experienced because of these works.</p>
<p>Name and Job Title: Spencer Aryeetey, Building Fabric Surveyor</p>
<p>Mobile: 07977 004475</p>
<p>Email: &nbsp;s.aryeetey@lboro.ac.uk</p>
<p>&nbsp;</p>]]></description>
<link>http://www.lboro.ac.uk/services/fm/campus-works-updates/listing/2026/ncsem-building-210---interior-construction-works---14th-16th-september-2026.html</link>
<guid isPermaLink="true">http://www.lboro.ac.uk/services/fm/campus-works-updates/listing/2026/ncsem-building-210---interior-construction-works---14th-16th-september-2026.html</guid>
<pubDate>Fri, 11 Sep 2026 10:30:00 GMT</pubDate>
</item>



<item>
<title><![CDATA[91²Ö¿â Stadium (205) - Pipework &amp; Outlet Disinfection - 17/09/2026]]></title>
<description><![CDATA[<h3>Description of the Works</h3>
<p>Pipework sectional disinfection to the 1<sup>st</sup> floor Bar and Kitchen.</p>
<p>The bar and kitchen will be out of use for approximately 2-3 hours between 7am - 1pm.</p>
<p><strong>TIMESCALE</strong></p>
<p>17/09/2026&nbsp;</p>
<h3>How can I get more information and help?</h3>
<p>The Estates and Facilities Management team member looking after the task is detailed below and can be contacted about any difficulties experienced because of these works.</p>
<p>Name and Job Title:&nbsp;Nikki Kilday &ndash; Water Hygiene</p>
<p>Mobile: 07394835656</p>
<p>Email: &nbsp;N.Kilday@lboro.ac.uk</p>
<p>&nbsp;</p>]]></description>
<link>http://www.lboro.ac.uk/services/fm/campus-works-updates/listing/2026/loughborough-stadium-205---pipework--outlet-disinfection---17092026.html</link>
<guid isPermaLink="true">http://www.lboro.ac.uk/services/fm/campus-works-updates/listing/2026/loughborough-stadium-205---pipework--outlet-disinfection---17092026.html</guid>
<pubDate>Fri, 11 Sep 2026 10:00:00 GMT</pubDate>
</item>



<item>
<title><![CDATA[Towers East (540) - Water Storage Tank Re Lining East 17 - 15/09/2026.]]></title>
<description><![CDATA[<h3>Description of the Works</h3>
<p>Cold Water Storage Tank Drain, Reline Internal Coating, Clean and Disinfect.</p>
<p>The 17<sup>th</sup> floor will be limited access while the work takes place<em>.</em></p>
<p><strong>TIMESCALE</strong></p>
<p>15/09/2026</p>
<h3>How can I get more information and help?</h3>
<p>The Estates and Facilities Management team member looking after the task is detailed below and can be contacted about any difficulties experienced because of these works.</p>
<p>Name and Job Title:&nbsp;Nikki Kilday &ndash; Water Hygiene</p>
<p>Mobile: 07394835656</p>
<p>Email: &nbsp;N.Kilday@lboro.ac.uk</p>
<p>&nbsp;</p>]]></description>
<link>http://www.lboro.ac.uk/services/fm/campus-works-updates/listing/2026/towers-east---water-storage-tank-re-lining---15092026.html</link>
<guid isPermaLink="true">http://www.lboro.ac.uk/services/fm/campus-works-updates/listing/2026/towers-east---water-storage-tank-re-lining---15092026.html</guid>
<pubDate>Fri, 11 Sep 2026 09:45:00 GMT</pubDate>
</item>



<item>
<title><![CDATA[Bridgeman re-branding &amp; internal iPad workstation -10 September to 16 September 2026]]></title>
<description><![CDATA[<h3>Description of the Works</h3>
<p>&nbsp;</p>
<p>Bridgeman Building - (206)</p>
<p>&nbsp;</p>
<p><strong>External</strong></p>
<p>Re-branding of Bridgeman Building and the area surrounding the revolving doors are to be highlighted as &ldquo;Student Central&rdquo;. The student service sign (near the crossroad) will be replaced with a <strong>Bridgeman Building</strong> sign to maintain a clear building identity. As part of these improvements, the current pink exterior render will also be repainted purple.&nbsp;</p>
<p><strong>Internal</strong></p>
<p>A new iPad workstation will be installed on the right-hand side of the entrance corridor. The workstation will be fully accessible and compliant with disability access requirements. It will provide secure charging and storage for four iPads, allowing them to be safely housed and readily available for use.</p>
<p>&nbsp;</p>
<p><strong>TIMESCALE</strong></p>
<ul>
<li>10<sup>th</sup> September 2026<strong> &ndash; </strong>remove existing signage Prepare and paint render after 5.00pm.</li>
<li>11<sup>th</sup> September<strong> &ndash; </strong>Install IPAD Station normal working hours.</li>
<li>14 -15<sup>th</sup> September<strong> &ndash; </strong>data point for WAP installation and new sockets for 4&nbsp; ipads</li>
<li>14-15 September<strong>&ndash; </strong>Signage installation normal working hours.</li>
<li>16<sup>th</sup> September &ndash;<strong> </strong>I.T. install and test-run.</li>
</ul>
<h3>How can I get more information and help?</h3>
<p>The Estates and Facilities Management team member looking after the task is detailed below and can be contacted about any difficulties experienced because of these works.</p>
<p>Name and Job Title: Jacob Sanderson &ndash; Project Manager</p>
<p>Mobile: 07542 512 059</p>
<p>Email: J.T.Sanderson@lboro.ac.uk</p>
<p>&nbsp;</p>]]></description>
<link>http://www.lboro.ac.uk/services/fm/campus-works-updates/listing/2026/bridgeman-re-branding-student-central--internal-ipad-station-1009--1609206.html</link>
<guid isPermaLink="true">http://www.lboro.ac.uk/services/fm/campus-works-updates/listing/2026/bridgeman-re-branding-student-central--internal-ipad-station-1009--1609206.html</guid>
<pubDate>Thu, 10 Sep 2026 16:30:00 GMT</pubDate>
</item>



<item>
<title><![CDATA[Fire Door Inspection -Elite Athletes Building (753) - Butler Court A (543) - 14 September to 30 October 2026]]></title>
<description><![CDATA[<h3>Description of the Works&nbsp;</h3>
<p><strong>WHY DOES THE WORK NEEED TO BE DONE</strong></p>
<p>The work needs to be done to ensure fire safety compliance within university buildings.</p>
<p><strong>HOW WILL THE WORKS AFFECT ME?</strong></p>
<p>The RLB Contractors will be working in various locations around the building, inspecting fire doors, with most of the work in corridors and staircases. The disruption is expected to be minimal. The contractor has been asked to report to receptions where applicable prior to carrying out the inspections in each building.&nbsp;Elite Athletes Building</p>
<p>&nbsp;Elite Athletes Building-(753)</p>
<p>&nbsp;Butler Court A - (543)</p>
<p><strong>Timescale</strong></p>
<div jsuid="zDqeqe_3" class="qJYHHd mp0vvc" data-xid="aim-mars-turn-root" jsmodel="TqqUIc" data-asrc="true">
<div jsname="RH7zg" jsmodel="CPTaDd LUQCCe pRMv2d" data-tr-rsts="false" class="tonYlb Uphzyf" data-sfc-cp="" jsaction="" jscontroller="ZA09ef" data-sfc-root="c" jsuid="zDqeqe_4e" data-wiz-uids="zDqeqe_4f" data-sfc-cb="" data-streaming-container="" eid="f3XXafSwGa2dhbIPk5iesQ0">
<div data-processed="true">
<div class="CKgc1d" data-scope-id="turn" jsname="CS7uPe" jsmodel="p9hQFe CPTaDd LUQCCe wuVnCd pRMv2d" jsaction="" jscontroller="uUCgYd" data-sfc-root="c" jsuid="paZN7d_0" data-sfc-cb="" data-processed="true" data-complete="true">
<div data-subtree="aimc" decode-data-ved="1" data-sfc-cp="" jsaction="" jscontroller="v48bt" data-sfc-root="c" jsuid="paZN7d_2" data-sfc-cb="" data-ved="2ahUKEwi07P2kvuCTAxWtTkEAHROMJ9YQ2O0OegYIAQgAEAA" data-hveid="CAEIABAA" data-processed="true" data-complete="true">
<div jsuid="paZN7d_1" class="Zkbeff" jsaction="rcuQ6b:&amp;paZN7d_1|npT2md" jscontroller="nfCumd" data-sfc-root="c" data-wiz-uids="paZN7d_3" data-sfc-cb="" data-processed="true" data-complete="true">
<div class="pWvJNd" jsaction="" jscontroller="zp3Dsd" data-sfc-root="c" jsuid="paZN7d_4" data-sfc-cb="" data-processed="true" data-complete="true">
<div jsuid="paZN7d_5" dir="ltr" data-container-id="main-col" data-xid="VpUvz" jsname="KFl8ub" class="mZJni Dn7Fzd" jsaction="" jscontroller="Aoijq" data-sfc-root="c" data-sfc-cb="" data-ved="2ahUKEwi07P2kvuCTAxWtTkEAHROMJ9YQ3KYQegYIAQgAEAE" data-processed="true">
<div jsuid="paZN7d_12" data-xid="Gd7Hsc" data-sfc-cp="" jsaction="aimRenderComplete:&amp;paZN7d_12|FJEdde;rcuQ6b:&amp;paZN7d_12|npT2md" jscontroller="a5f0he" data-sfc-root="c" data-sfc-cb="" data-complete="true" data-processed="true">
<div class="DBd2Wb" jsmodel="Qdu94e" data-complete="true" data-processed="true">
<div class="zkL70c" data-processed="true">
<div jsuid="paZN7d_14" class="RkJvxe" jsaction="rcuQ6b:&amp;paZN7d_14|npT2md" jscontroller="RU9mjc" data-sfc-root="c" data-wiz-uids="paZN7d_15" data-sfc-cb="" data-complete="true" data-processed="true">
<div jsuid="paZN7d_16" class="YHsVn" data-sfc-cp="" jsaction="rcuQ6b:&amp;paZN7d_16|npT2md" jscontroller="nqTR2b" data-sfc-root="c" data-wiz-uids="paZN7d_17,paZN7d_18" data-sfc-cb="" data-complete="true" data-processed="true">
<div class="" data-processed="true">
<p>From 14/9/26 to 30/10/26 Fire doors inspections will take place in the buildings above between, 9.00am -5.00pm.</p>
</div>
</div>
</div>
</div>
</div>
</div>
</div>
</div>
</div>
</div>
</div>
</div>
</div>
</div>
<h3>How can I get more information and help?</h3>
<p>The Estates and Facilities Management team member looking after the task is detailed below and can be contacted about any difficulties experienced because of these works.</p>
<p><strong>Name and Job Title</strong>: Rod Harrison - Fire Compliance Contract Supervisor</p>
<p><strong>Mobile</strong>: 07729080155</p>
<p><strong>Email</strong>: &nbsp;<a href="mailto:r.m.harrison@lboro.ac.uk">r.m.harrison@lboro.ac.uk</a></p>
<p>&nbsp;</p>]]></description>
<link>http://www.lboro.ac.uk/services/fm/campus-works-updates/listing/2026/fire-door-inspection--elite-athletes-building--butler-court-1409--30102026.html</link>
<guid isPermaLink="true">http://www.lboro.ac.uk/services/fm/campus-works-updates/listing/2026/fire-door-inspection--elite-athletes-building--butler-court-1409--30102026.html</guid>
<pubDate>Thu, 10 Sep 2026 13:00:00 GMT</pubDate>
</item>



<item>
<title><![CDATA[Cold Water Storage Tanks Clean and Disinfection- EIS Performance Centre (031) 14 September 2026]]></title>
<description><![CDATA[<h3>Description of the Works&nbsp;</h3>
<p>&nbsp;</p>
<p>EIS performance Centre (031)</p>
<p>&nbsp;</p>
<p>Rubber Crumb Plant room. Cold water storage tanks&nbsp; need draining, cleaning and disinfecting.</p>
<p>The two tanks can be done individually so this should not affect services</p>
<p>&nbsp;</p>
<p><strong>Timescale</strong></p>
<div jsuid="zDqeqe_3" class="qJYHHd mp0vvc" data-xid="aim-mars-turn-root" jsmodel="TqqUIc" data-asrc="true">
<div jsname="RH7zg" jsmodel="CPTaDd LUQCCe pRMv2d" data-tr-rsts="false" class="tonYlb Uphzyf" data-sfc-cp="" jsaction="" jscontroller="ZA09ef" data-sfc-root="c" jsuid="zDqeqe_4e" data-wiz-uids="zDqeqe_4f" data-sfc-cb="" data-streaming-container="" eid="f3XXafSwGa2dhbIPk5iesQ0">
<div data-processed="true">
<div class="CKgc1d" data-scope-id="turn" jsname="CS7uPe" jsmodel="p9hQFe CPTaDd LUQCCe wuVnCd pRMv2d" jsaction="" jscontroller="uUCgYd" data-sfc-root="c" jsuid="paZN7d_0" data-sfc-cb="" data-processed="true" data-complete="true">
<div data-subtree="aimc" decode-data-ved="1" data-sfc-cp="" jsaction="" jscontroller="v48bt" data-sfc-root="c" jsuid="paZN7d_2" data-sfc-cb="" data-ved="2ahUKEwi07P2kvuCTAxWtTkEAHROMJ9YQ2O0OegYIAQgAEAA" data-hveid="CAEIABAA" data-processed="true" data-complete="true">
<div jsuid="paZN7d_1" class="Zkbeff" jsaction="rcuQ6b:&amp;paZN7d_1|npT2md" jscontroller="nfCumd" data-sfc-root="c" data-wiz-uids="paZN7d_3" data-sfc-cb="" data-processed="true" data-complete="true">
<div class="pWvJNd" jsaction="" jscontroller="zp3Dsd" data-sfc-root="c" jsuid="paZN7d_4" data-sfc-cb="" data-processed="true" data-complete="true">
<div jsuid="paZN7d_5" dir="ltr" data-container-id="main-col" data-xid="VpUvz" jsname="KFl8ub" class="mZJni Dn7Fzd" jsaction="" jscontroller="Aoijq" data-sfc-root="c" data-sfc-cb="" data-ved="2ahUKEwi07P2kvuCTAxWtTkEAHROMJ9YQ3KYQegYIAQgAEAE" data-processed="true">
<div jsuid="paZN7d_12" data-xid="Gd7Hsc" data-sfc-cp="" jsaction="aimRenderComplete:&amp;paZN7d_12|FJEdde;rcuQ6b:&amp;paZN7d_12|npT2md" jscontroller="a5f0he" data-sfc-root="c" data-sfc-cb="" data-complete="true" data-processed="true">
<div class="DBd2Wb" jsmodel="Qdu94e" data-complete="true" data-processed="true">
<div class="zkL70c" data-processed="true">
<div jsuid="paZN7d_14" class="RkJvxe" jsaction="rcuQ6b:&amp;paZN7d_14|npT2md" jscontroller="RU9mjc" data-sfc-root="c" data-wiz-uids="paZN7d_15" data-sfc-cb="" data-complete="true" data-processed="true">
<div jsuid="paZN7d_16" class="YHsVn" data-sfc-cp="" jsaction="rcuQ6b:&amp;paZN7d_16|npT2md" jscontroller="nqTR2b" data-sfc-root="c" data-wiz-uids="paZN7d_17,paZN7d_18" data-sfc-cb="" data-complete="true" data-processed="true">
<div class="" data-processed="true">
<p>14 September 2026</p>
<p>How can I get more information and help?</p>
</div>
</div>
</div>
</div>
</div>
</div>
</div>
</div>
</div>
</div>
</div>
</div>
</div>
</div>
<p>The Estates and Facilities Management team member looking after the task is detailed below and can be contacted about any difficulties experienced because of these works.</p>
<p><strong>Name and Job Title</strong>: Nikki Kilday &ndash; Water Hygiene</p>
<p><strong>Mobile</strong>: 07394835656</p>
<p><strong>Email</strong>: &nbsp;N.Kilday@lboro.ac.uk</p>
<p>&nbsp;</p>]]></description>
<link>http://www.lboro.ac.uk/services/fm/campus-works-updates/listing/2026/cold-water-storage-tanks-clean-and-disinfection-14092026.html</link>
<guid isPermaLink="true">http://www.lboro.ac.uk/services/fm/campus-works-updates/listing/2026/cold-water-storage-tanks-clean-and-disinfection-14092026.html</guid>
<pubDate>Thu, 10 Sep 2026 11:00:00 GMT</pubDate>
</item>



<item>
<title><![CDATA[High Voltage Maintenance Works - Substation 16 - Sir Richard Morris (069), Graham Dilley Pavilion (204) - Saturday 12 September 2026 - 8.00 a.m. - 12.00 p.m.]]></title>
<description><![CDATA[<h3>Description of the Works</h3>
<p>There will be no power to the above buildings/areas during the times stated below, this is so we can carry out essential maintenance works to the substation switchgear and transformer to ensure continued operation and maintain electrical compliance.</p>
<h3>Timescale</h3>
<p>Saturday 12 September 2026 - 8.00 a.m. - 12.00 p.m.</p>
<h3>How can I get more information and help?</h3>
<p>The Estates and Facilities Management team member looking after the task is detailed below and can be contacted about any difficulties experienced because of these works.</p>
<p>Adam Slater - Electrical Services Manager</p>
<p>Mobile: 07772 626 487</p>
<p>Email: A.M.Slater@lboro.ac.uk</p>]]></description>
<link>http://www.lboro.ac.uk/services/fm/campus-works-updates/listing/2026/high-voltage-maintenance---sub-16---richard-morris---graham-dilley---12092026.html</link>
<guid isPermaLink="true">http://www.lboro.ac.uk/services/fm/campus-works-updates/listing/2026/high-voltage-maintenance---sub-16---richard-morris---graham-dilley---12092026.html</guid>
<pubDate>Thu, 10 Sep 2026 09:00:00 GMT</pubDate>
</item>



<item>
<title><![CDATA[Installation of External Signage -Sir Richard Morris Building (069)  - 16  September 2026]]></title>
<description><![CDATA[<h3>Description of the Works</h3>
<p>Sir Richard Morris Building (069)</p>
<p>Installation of new external building signage to improve identification and wayfinding for students, staff, and visitors</p>
<p><strong>TIMESCALE</strong></p>
<p>16 September&nbsp;</p>
<h3>How can I get more information and help?</h3>
<p>The Estates and Facilities Management team member looking after the task is detailed below and can be contacted about any difficulties experienced because of these works.</p>
<p>Name and Job Title: Tom Dell &ndash; Building Fabric&nbsp;</p>
<p>Mobile: 07895331871</p>
<p>Email: t.dell@lboro.ac.uk</p>
<p>&nbsp;</p>]]></description>
<link>http://www.lboro.ac.uk/services/fm/campus-works-updates/listing/2026/installation-of-external-signage--sir-richard-morris-building---16092026.html</link>
<guid isPermaLink="true">http://www.lboro.ac.uk/services/fm/campus-works-updates/listing/2026/installation-of-external-signage--sir-richard-morris-building---16092026.html</guid>
<pubDate>Wed, 09 Sep 2026 15:30:00 GMT</pubDate>
</item>



<item>
<title><![CDATA[Fire Door Inspection- David Collett Blocks A to F - 14/9/26 to 30/10/26.]]></title>
<description><![CDATA[<h3>Description of the Works&nbsp;</h3>
<p><strong>WHY DOES THE WORK NEEED TO BE DONE</strong></p>
<p>The work needs to be done to ensure fire safety compliance within university buildings.</p>
<p><strong>HOW WILL THE WORKS AFFECT ME?</strong></p>
<p>The RLB Contractors will be working in various locations around the building, inspecting fire doors, with most of the work in corridors and staircases. The disruption is expected to be minimal. The contractor has been asked to report to receptions where applicable prior to carrying out the inspections in each building.</p>
<p>David Collett Block A (533)</p>
<p>David Collett Block B (534)</p>
<p>David Collett Block C (535)</p>
<p>David Collett Block D (536)</p>
<p>David Collett Block E (537)</p>
<p>David Collett Block F (538)</p>
<p><strong>Timescale</strong></p>
<div jsuid="zDqeqe_3" class="qJYHHd mp0vvc" data-xid="aim-mars-turn-root" jsmodel="TqqUIc" data-asrc="true">
<div jsname="RH7zg" jsmodel="CPTaDd LUQCCe pRMv2d" data-tr-rsts="false" class="tonYlb Uphzyf" data-sfc-cp="" jsaction="" jscontroller="ZA09ef" data-sfc-root="c" jsuid="zDqeqe_4e" data-wiz-uids="zDqeqe_4f" data-sfc-cb="" data-streaming-container="" eid="f3XXafSwGa2dhbIPk5iesQ0">
<div data-processed="true">
<div class="CKgc1d" data-scope-id="turn" jsname="CS7uPe" jsmodel="p9hQFe CPTaDd LUQCCe wuVnCd pRMv2d" jsaction="" jscontroller="uUCgYd" data-sfc-root="c" jsuid="paZN7d_0" data-sfc-cb="" data-processed="true" data-complete="true">
<div data-subtree="aimc" decode-data-ved="1" data-sfc-cp="" jsaction="" jscontroller="v48bt" data-sfc-root="c" jsuid="paZN7d_2" data-sfc-cb="" data-ved="2ahUKEwi07P2kvuCTAxWtTkEAHROMJ9YQ2O0OegYIAQgAEAA" data-hveid="CAEIABAA" data-processed="true" data-complete="true">
<div jsuid="paZN7d_1" class="Zkbeff" jsaction="rcuQ6b:&amp;paZN7d_1|npT2md" jscontroller="nfCumd" data-sfc-root="c" data-wiz-uids="paZN7d_3" data-sfc-cb="" data-processed="true" data-complete="true">
<div class="pWvJNd" jsaction="" jscontroller="zp3Dsd" data-sfc-root="c" jsuid="paZN7d_4" data-sfc-cb="" data-processed="true" data-complete="true">
<div jsuid="paZN7d_5" dir="ltr" data-container-id="main-col" data-xid="VpUvz" jsname="KFl8ub" class="mZJni Dn7Fzd" jsaction="" jscontroller="Aoijq" data-sfc-root="c" data-sfc-cb="" data-ved="2ahUKEwi07P2kvuCTAxWtTkEAHROMJ9YQ3KYQegYIAQgAEAE" data-processed="true">
<div jsuid="paZN7d_12" data-xid="Gd7Hsc" data-sfc-cp="" jsaction="aimRenderComplete:&amp;paZN7d_12|FJEdde;rcuQ6b:&amp;paZN7d_12|npT2md" jscontroller="a5f0he" data-sfc-root="c" data-sfc-cb="" data-complete="true" data-processed="true">
<div class="DBd2Wb" jsmodel="Qdu94e" data-complete="true" data-processed="true">
<div class="zkL70c" data-processed="true">
<div jsuid="paZN7d_14" class="RkJvxe" jsaction="rcuQ6b:&amp;paZN7d_14|npT2md" jscontroller="RU9mjc" data-sfc-root="c" data-wiz-uids="paZN7d_15" data-sfc-cb="" data-complete="true" data-processed="true">
<div jsuid="paZN7d_16" class="YHsVn" data-sfc-cp="" jsaction="rcuQ6b:&amp;paZN7d_16|npT2md" jscontroller="nqTR2b" data-sfc-root="c" data-wiz-uids="paZN7d_17,paZN7d_18" data-sfc-cb="" data-complete="true" data-processed="true">
<div class="" data-processed="true">
<p>From 14/9/26 to 30/10/26 Fire doors inspections will take place in the buildings above between, 9.00am -5.00pm.</p>
</div>
</div>
</div>
</div>
</div>
</div>
</div>
</div>
</div>
</div>
</div>
</div>
</div>
</div>
<h3>How can I get more information and help?</h3>
<p>The Estates and Facilities Management team member looking after the task is detailed below and can be contacted about any difficulties experienced because of these works.</p>
<p><strong>Name and Job Title</strong>: Rod Harrison - Fire Compliance Contract Supervisor</p>
<p><strong>Mobile</strong>: 07729080155</p>
<p><strong>Email</strong>: &nbsp;<a href="mailto:r.m.harrison@lboro.ac.uk">r.m.harrison@lboro.ac.uk</a></p>
<p>&nbsp;</p>]]></description>
<link>http://www.lboro.ac.uk/services/fm/campus-works-updates/listing/2026/fire-door-inspection--david-collett-blocks-a-to-f---14926-to-301026.html</link>
<guid isPermaLink="true">http://www.lboro.ac.uk/services/fm/campus-works-updates/listing/2026/fire-door-inspection--david-collett-blocks-a-to-f---14926-to-301026.html</guid>
<pubDate>Wed, 09 Sep 2026 13:15:00 GMT</pubDate>
</item>



<item>
<title><![CDATA[Multiple Buildings (Details listed below) - Quarterly Fire Alarm Maintenance (Visit 4/4) - 14 -18 September 2026. 
]]></title>
<description><![CDATA[<h3>Description of the Works</h3>
<p>This is the fourth fire alarm visit for the testing (October 2025 - September 2026) set out by the University schedule, and requires a visit of silent testing, preceded (or followed) by <strong>LIVE TESTING</strong>, which will involve activating <strong>all sounders and fire interfaces in the building(s)</strong>.</p>
<p>During the <strong>LIVE TESTING</strong>, all sounders will be activated.&nbsp; BTS will be wearing ear defenders, but cannot supply them to all the occupiers of the buildings.&nbsp; The building does not need to be evacuated, but can be if the occupiers so wish.&nbsp; All interfaces will be activated which mostly (but not limited to) action BMS links and door closures.&nbsp; There can be no exceptions due to the requirements of the tests.&nbsp; The alarms should be assumed to be activated for a period of up to 15 minutes from the time stated below (in brackets) unless otherwise stated.</p>
<p>BTS can make no guarantee that we will be able to get plant back online as soon as the test is finished but we can contact E&amp;FM to assist where required.</p>
<p>A period of silent testing will follow (or precede) this where a selection of input devices around the building(s) will be activated silently.&nbsp; This will not activate any outputs on the system.&nbsp; BTS will regularly monitor the system for any real fires and raise the alarm if necessary.</p>
<p>Once this notice has been sent, access will be assumed to have been granted to BTS for the dates/times and activations mentioned below UNLESS we are contacted prior to the date/time in question with at least three days notice.</p>
<h3>Timescale</h3>
<p><strong>14 September 2026</strong></p>
<p><strong>S Building (021) </strong>&ndash; 07:30 a.m. &ndash; 16:00 p.m. (Alarms 07:30 a.m. &ndash; 08:00 a.m.)</p>
<p><strong>15 September 2026</strong></p>
<p><strong>James France (006)</strong>&ndash; 07:30 &ndash; 16:00 (Alarms 07:30 &ndash; 08:00)</p>
<p><strong>James France</strong> <strong>Admin</strong> <strong>( 011)</strong>&ndash; 07:30 &ndash; 16:00 (Alarms 07:30 &ndash; 08:00)</p>
<p><strong>16 September 2026</strong></p>
<p><strong>Stewart Miller (066)</strong> &ndash; 07:30 a.m. &ndash; 10:00 a.m. (Alarms 07:30 a.m. &ndash; 08:00 a.m.)</p>
<p><strong>West Park Teaching Hub (217)</strong> &ndash; 10:00 a.m. &ndash; 12:00 p.m. (Alarms 10:00 a.m.)</p>
<p><strong>Fitness Centre (216)</strong> &ndash; 13:00 p.m. &ndash; 16:00 p.m. (Alarms 13:00 p.m. &ndash; 13:00 p.m.)</p>
<p><strong>17 September 2026</strong></p>
<p><strong>Pilkington Library (030)&nbsp;</strong> &ndash; 07:30 a.m. &ndash; 16:00 p.m. (Alarms 07:30 a.m. &ndash; 08:30 p.m.)</p>
<p>&nbsp;</p>
<h3>How can I get more information and help?</h3>
<p>The Estates and Facilities Management team member looking after the task is detailed below and can be contacted about any difficulties experienced because of these works.</p>
<p>Edward Roe - Fire Alarm Engineer for BTS</p>
<p>Mobile: 07884237879</p>
<p>Email: <a href="mailto:Edward@buildingtechnologyservices.co.uk">Edward@buildingtechnologyservices.co.uk</a></p>
<p>&nbsp;</p>]]></description>
<link>http://www.lboro.ac.uk/services/fm/campus-works-updates/listing/2026/quarterly-fire-alarm-maintenance-visit-4-of-4----14--18--september-2026.html</link>
<guid isPermaLink="true">http://www.lboro.ac.uk/services/fm/campus-works-updates/listing/2026/quarterly-fire-alarm-maintenance-visit-4-of-4----14--18--september-2026.html</guid>
<pubDate>Mon, 07 Sep 2026 11:00:00 GMT</pubDate>
</item>



<item>
<title><![CDATA[Fire Damper Annual Inspection and Service- Royce 20 (471) - Royce 22 (473) 07/09/2026 to 30/09/2026]]></title>
<description><![CDATA[<h3>Description of the Works</h3>
<p>&nbsp;</p>
<p>Royce Block 20 (471)</p>
<p>Royce Block 22 (473)</p>
<p>&nbsp;</p>
<p><strong>WHY DOES THE WORK NEEED TO BE DONE:</strong></p>
<p>The work needs to be done to ensure fire safety within University buildings.</p>
<p><strong>&nbsp;</strong><strong>HOW WILL THE WORKS AFFECT ME?</strong></p>
<p>The contractor (Rock Compliance Ltd) will be working in various locations around the building, so please observe any barriers and warning signs.&nbsp; The disruption is expected to be minimal; the contractor has been asked to report to reception where applicable, prior to carrying out the inspections in each building.</p>
<p><strong>TIMESCALE </strong></p>
<p>7 September to 30 September 2026</p>
<p>Fire Damper inspections will take place in the buildings above between&nbsp; 9.00 a.m. and 5.00 p.m. (Monday to Friday only).</p>
<h3>How can I get more information and help?</h3>
<p>The Estates and Facilities Management team member looking after the task is detailed below and can be contacted about any difficulties experienced because of these works.</p>
<p>Name and Job Title: Fire Compliance Contract Supervisor</p>
<p>Mobile: 07729080155</p>
<p>Email: <a href="mailto:r.m.harrison@lboro.ac.uk">r.m.harrison@lboro.ac.uk</a></p>
<p>&nbsp;</p>]]></description>
<link>http://www.lboro.ac.uk/services/fm/campus-works-updates/listing/2026/fire-damper-annual-inspection--service-07092026-30092026.html</link>
<guid isPermaLink="true">http://www.lboro.ac.uk/services/fm/campus-works-updates/listing/2026/fire-damper-annual-inspection--service-07092026-30092026.html</guid>
<pubDate>Thu, 03 Sep 2026 17:00:00 GMT</pubDate>
</item>



<item>
<title><![CDATA[Electrical Testing and Small Works-Wolfson Building (027)- Wolfson Annex (050)-Wolfson School of Mechanical and Manufacturing Engineering (065) -21/09/2026-21/11/2026]]></title>
<description><![CDATA[<h3>Description of the Works</h3>
<p>&nbsp;</p>
<p>Wolfson Annex (050)</p>
<p>Wolfson Building (027)</p>
<p>Wolfson School of Mechanical and Manufacturing Engineering (065)</p>
<p>&nbsp;</p>
<p>Electrical Testing of all electrical circuits within the building. Over the duration of the works all circuits will be turned off 1 at a time to carry out tests, each circuit will be off for no more than 20 minutes per circuit. This will mean lighting and power supplies will be affected for short durations of time.&nbsp; Full testing and inspection of the electrical installation is required to comply with The Electricity at Work Regulations 1989.</p>
<p>&nbsp;</p>
<p><strong>TIMESCALE </strong></p>
<p>21 September to 21 November 2026</p>
<p>&nbsp;</p>
<h3>How can I get more information and help?</h3>
<p>The Estates and Facilities Management team member looking after the task is detailed below and can be contacted about any difficulties experienced because of these works.</p>
<p>Name and Job Title: Michael Wraight, Electrical Contracts Supervisor</p>
<p>Mobile: 07895 331913</p>
<p>Email: m.wraight@lboro.ac.uk</p>
<p>&nbsp;</p>]]></description>
<link>http://www.lboro.ac.uk/services/fm/campus-works-updates/listing/2026/electrical-testing-and-small-works--wolfson-21092026-21112026.html</link>
<guid isPermaLink="true">http://www.lboro.ac.uk/services/fm/campus-works-updates/listing/2026/electrical-testing-and-small-works--wolfson-21092026-21112026.html</guid>
<pubDate>Wed, 02 Sep 2026 15:00:00 GMT</pubDate>
</item>



<item>
<title><![CDATA[Electrical Testing and Small Works- Holywell Farmhouse (214)- Holywell Farm Buildings (218) 21/09/2026-21/11/2026]]></title>
<description><![CDATA[<h3>Description of the Works</h3>
<p>&nbsp;</p>
<p>Holywell Farmhouse (214)</p>
<p>Holywell Farm Buildings (218)</p>
<p>&nbsp;</p>
<p>Electrical Testing of all electrical circuits within the building. Over the duration of the works all circuits will be turned off 1 at a time to carry out tests, each circuit will be off for no more than 20 minutes per circuit. This will mean lighting and power supplies will be affected for short durations of time.&nbsp; Full testing and inspection of the electrical installation is required to comply with The Electricity at Work Regulations 1989.</p>
<p>&nbsp;</p>
<p><strong>TIMESCALE </strong></p>
<p>21 September to 21 November 2026</p>
<p>&nbsp;</p>
<h3>How can I get more information and help?</h3>
<p>The Estates and Facilities Management team member looking after the task is detailed below and can be contacted about any difficulties experienced because of these works.</p>
<p>Name and Job Title: Michael Wraight, Electrical Contracts Supervisor</p>
<p>Mobile: 07895 331913</p>
<p>Email: m.wraight@lboro.ac.uk</p>
<p>&nbsp;</p>]]></description>
<link>http://www.lboro.ac.uk/services/fm/campus-works-updates/listing/2026/electrical-testing-and-small-works-21092026-21112026.html</link>
<guid isPermaLink="true">http://www.lboro.ac.uk/services/fm/campus-works-updates/listing/2026/electrical-testing-and-small-works-21092026-21112026.html</guid>
<pubDate>Wed, 02 Sep 2026 13:00:00 GMT</pubDate>
</item>



<item>
<title><![CDATA[Emergency Lighting Remedial Works -Atic (220)-28 August 2026 Until Completed 
]]></title>
<description><![CDATA[<h3>Description of the Works</h3>
<p>Atic (020)</p>
<p>This work is required to ensure compliance of the emergency lighting system. Engineers will be working in and around the building and office spaces carrying out repairs.</p>
<p><strong>TIMESCALE </strong></p>
<p>28 August 2026 Until work has been fully completed</p>
<p>&nbsp;</p>
<h3>How can I get more information and help?</h3>
<p>The Estates and Facilities Management team member looking after the task is detailed below and can be contacted about any difficulties experienced because of these works.</p>
<p>Name and Job Title: Adam Slater Electrical Services Manager</p>
<p>Mobile: 07772626487</p>
<p>Email: A.M.Slater@lboro.ac.uk</p>
<p>&nbsp;</p>]]></description>
<link>http://www.lboro.ac.uk/services/fm/campus-works-updates/listing/2026/emergency-lighting-remedial-works-220-28082026.html</link>
<guid isPermaLink="true">http://www.lboro.ac.uk/services/fm/campus-works-updates/listing/2026/emergency-lighting-remedial-works-220-28082026.html</guid>
<pubDate>Fri, 28 Aug 2026 13:00:00 GMT</pubDate>
</item>



<item>
<title><![CDATA[Pilkington Library (030) - Installation of Microwave Station - 03 September - 18 September 2026
]]></title>
<description><![CDATA[<h3>Description of the Works</h3>
<p>Supply and install a new unit, including 100mm laminated side panels, a 60mm bullnosed worktop, top boxing with removable access panel and integrated LED strip lighting. Provide removable 18mm MFC rear panels above and below the worktop, together with two flush-mounted sockets, one flush-mounted extraction hood and two microwaves. Supply and fit new grey vinyl flooring.</p>
<p><strong>Timescale</strong></p>
<div jsuid="zDqeqe_3" class="qJYHHd mp0vvc" data-xid="aim-mars-turn-root" jsmodel="TqqUIc" data-asrc="true">
<div jsname="RH7zg" jsmodel="CPTaDd LUQCCe pRMv2d" data-tr-rsts="false" class="tonYlb Uphzyf" data-sfc-cp="" jsaction="" jscontroller="ZA09ef" data-sfc-root="c" jsuid="zDqeqe_4e" data-wiz-uids="zDqeqe_4f" data-sfc-cb="" data-streaming-container="" eid="f3XXafSwGa2dhbIPk5iesQ0">
<div data-processed="true">
<div class="CKgc1d" data-scope-id="turn" jsname="CS7uPe" jsmodel="p9hQFe CPTaDd LUQCCe wuVnCd pRMv2d" jsaction="" jscontroller="uUCgYd" data-sfc-root="c" jsuid="paZN7d_0" data-sfc-cb="" data-processed="true" data-complete="true">
<div data-subtree="aimc" decode-data-ved="1" data-sfc-cp="" jsaction="" jscontroller="v48bt" data-sfc-root="c" jsuid="paZN7d_2" data-sfc-cb="" data-ved="2ahUKEwi07P2kvuCTAxWtTkEAHROMJ9YQ2O0OegYIAQgAEAA" data-hveid="CAEIABAA" data-processed="true" data-complete="true">
<div jsuid="paZN7d_1" class="Zkbeff" jsaction="rcuQ6b:&amp;paZN7d_1|npT2md" jscontroller="nfCumd" data-sfc-root="c" data-wiz-uids="paZN7d_3" data-sfc-cb="" data-processed="true" data-complete="true">
<div class="pWvJNd" jsaction="" jscontroller="zp3Dsd" data-sfc-root="c" jsuid="paZN7d_4" data-sfc-cb="" data-processed="true" data-complete="true">
<div jsuid="paZN7d_5" dir="ltr" data-container-id="main-col" data-xid="VpUvz" jsname="KFl8ub" class="mZJni Dn7Fzd" jsaction="" jscontroller="Aoijq" data-sfc-root="c" data-sfc-cb="" data-ved="2ahUKEwi07P2kvuCTAxWtTkEAHROMJ9YQ3KYQegYIAQgAEAE" data-processed="true">
<div jsuid="paZN7d_12" data-xid="Gd7Hsc" data-sfc-cp="" jsaction="aimRenderComplete:&amp;paZN7d_12|FJEdde;rcuQ6b:&amp;paZN7d_12|npT2md" jscontroller="a5f0he" data-sfc-root="c" data-sfc-cb="" data-complete="true" data-processed="true">
<div class="DBd2Wb" jsmodel="Qdu94e" data-complete="true" data-processed="true">
<div class="zkL70c" data-processed="true">
<div jsuid="paZN7d_14" class="RkJvxe" jsaction="rcuQ6b:&amp;paZN7d_14|npT2md" jscontroller="RU9mjc" data-sfc-root="c" data-wiz-uids="paZN7d_15" data-sfc-cb="" data-complete="true" data-processed="true">
<div jsuid="paZN7d_16" class="YHsVn" data-sfc-cp="" jsaction="rcuQ6b:&amp;paZN7d_16|npT2md" jscontroller="nqTR2b" data-sfc-root="c" data-wiz-uids="paZN7d_17,paZN7d_18" data-sfc-cb="" data-complete="true" data-processed="true">
<div class="" data-processed="true">
<p>03 September to 18 September 2026</p>
</div>
</div>
</div>
</div>
</div>
</div>
</div>
</div>
</div>
</div>
</div>
</div>
</div>
</div>
<h3>How can I get more information and help?</h3>
<p>The Estates and Facilities Management team member looking after the task is detailed below and can be contacted about any difficulties experienced because of these works.</p>
<p><strong>Name and Job Title</strong>: Tom Dell &ndash; Building Fabric Surveyor</p>
<p><strong>Mobile</strong>: &nbsp; 07895 331 871</p>
<p><strong>Email</strong>: &nbsp;t.dell@lboro.ac.uk</p>
<p>&nbsp;</p>]]></description>
<link>http://www.lboro.ac.uk/services/fm/campus-works-updates/listing/2026/pilkington-library-030---installation-of-microwave-station-0309-18092026-.html</link>
<guid isPermaLink="true">http://www.lboro.ac.uk/services/fm/campus-works-updates/listing/2026/pilkington-library-030---installation-of-microwave-station-0309-18092026-.html</guid>
<pubDate>Wed, 26 Aug 2026 11:00:00 GMT</pubDate>
</item>



<item>
<title><![CDATA[Village Dining New Boiler System Installation - 24/08/2026 (for six weeks)

]]></title>
<description><![CDATA[<h3>Description of the Works</h3>
<p>Works are to take place on AHU_1 which serves the main restaurant space of Village Dining alongside AHU_2. During this time only AHU_2 will be operational.</p>
<p>The heating burner to AHU_1 was replaced with a LTHW coil last year, a new LTHW boiler system is to be installed to serve the new heating coil to AHU_1. (AHU_2 remains as existing direct gas fired).</p>
<p>The new boiler system will include the installation of 2No. 100kW boilers, these will serve as resilience and futureproof the installation for AHU_2 future requirements. A new common flue will be installed to serve the boilers and pipework with spare future connections for AHU_2 to be connected later if/when required. The new system will be connected to the local control panel with new sensors to the pipework and AHU_1 ductwork sections to allow BMS integration control.</p>
<p>The existing run around coil pipework serving AHU_2 is to be altered to make space for the new boiler system including secondary and ancillary equipment. New valves and pipework will be installed to join the R-A-C pipework of AHU_2 to AHU_1 to allow the quick fill loop of AHU_1 to be used to fill both systems, the valves will be left closed under normal operation.</p>
<p><strong>TIMESCALE</strong></p>
<p>Commencing Monday 24 August 2026 for 6 weeks.</p>
<h3>How can I get more information and help?</h3>
<p>The Estates and Facilities Management team member looking after the task is detailed below and can be contacted about any difficulties experienced because of these works.</p>
<p>Name and Job Title: - Aaron Smart &ndash; Mechanical Building Services Engineer&nbsp;</p>
<p>Mobile: - 07989 420705</p>
<p>Email: - <a href="mailto:a.j.smart@lboro.ac.uk">a.j.smart@lboro.ac.uk</a></p>]]></description>
<link>http://www.lboro.ac.uk/services/fm/campus-works-updates/listing/2026/village-dining-new-boiler-system-installation---24082026-for-six-weeks.html</link>
<guid isPermaLink="true">http://www.lboro.ac.uk/services/fm/campus-works-updates/listing/2026/village-dining-new-boiler-system-installation---24082026-for-six-weeks.html</guid>
<pubDate>Tue, 18 Aug 2026 10:30:00 GMT</pubDate>
</item>



<item>
<title><![CDATA[Sir John Beckwith (071), Brockington Extension (029) &amp; Morag Bell (009) - Interior Painting Works - 19th August -  18th September 2026 ]]></title>
<description><![CDATA[<h3>Description of the Works&nbsp;</h3>
<p>The university is carrying out interior redecoration works to various corridor floors, offices &amp; seminar rooms, as detailed below.</p>
<p>Sir John Beckwith (First floor)</p>
<p>Brockington Extension (Ground Floor)</p>
<p>Morag Bell (Ground Floor).</p>
<p>Please note that, during the immediate phase of the works, the affected areas may be partially or fully closed. Access may be temporarily restricted or compromised locally at certain times to facilitate the safe completion of the works.</p>
<p>For your safety, please observe and comply with all signage, barriers and safety notices displayed around the work area throughout the works period.</p>
<p>The Estates and Facilities Management team member responsible for the works is detailed below and can be contacted should you experience any difficulties or require assistance arising from the works..</p>
<p><strong>Timescale</strong></p>
<div jsuid="zDqeqe_3" class="qJYHHd mp0vvc" data-xid="aim-mars-turn-root" jsmodel="TqqUIc" data-asrc="true">
<div jsname="RH7zg" jsmodel="CPTaDd LUQCCe pRMv2d" data-tr-rsts="false" class="tonYlb Uphzyf" data-sfc-cp="" jsaction="" jscontroller="ZA09ef" data-sfc-root="c" jsuid="zDqeqe_4e" data-wiz-uids="zDqeqe_4f" data-sfc-cb="" data-streaming-container="" eid="f3XXafSwGa2dhbIPk5iesQ0">
<div data-processed="true">
<div class="CKgc1d" data-scope-id="turn" jsname="CS7uPe" jsmodel="p9hQFe CPTaDd LUQCCe wuVnCd pRMv2d" jsaction="" jscontroller="uUCgYd" data-sfc-root="c" jsuid="paZN7d_0" data-sfc-cb="" data-processed="true" data-complete="true">
<div data-subtree="aimc" decode-data-ved="1" data-sfc-cp="" jsaction="" jscontroller="v48bt" data-sfc-root="c" jsuid="paZN7d_2" data-sfc-cb="" data-ved="2ahUKEwi07P2kvuCTAxWtTkEAHROMJ9YQ2O0OegYIAQgAEAA" data-hveid="CAEIABAA" data-processed="true" data-complete="true">
<div jsuid="paZN7d_1" class="Zkbeff" jsaction="rcuQ6b:&amp;paZN7d_1|npT2md" jscontroller="nfCumd" data-sfc-root="c" data-wiz-uids="paZN7d_3" data-sfc-cb="" data-processed="true" data-complete="true">
<div class="pWvJNd" jsaction="" jscontroller="zp3Dsd" data-sfc-root="c" jsuid="paZN7d_4" data-sfc-cb="" data-processed="true" data-complete="true">
<div jsuid="paZN7d_5" dir="ltr" data-container-id="main-col" data-xid="VpUvz" jsname="KFl8ub" class="mZJni Dn7Fzd" jsaction="" jscontroller="Aoijq" data-sfc-root="c" data-sfc-cb="" data-ved="2ahUKEwi07P2kvuCTAxWtTkEAHROMJ9YQ3KYQegYIAQgAEAE" data-processed="true">
<div jsuid="paZN7d_12" data-xid="Gd7Hsc" data-sfc-cp="" jsaction="aimRenderComplete:&amp;paZN7d_12|FJEdde;rcuQ6b:&amp;paZN7d_12|npT2md" jscontroller="a5f0he" data-sfc-root="c" data-sfc-cb="" data-complete="true" data-processed="true">
<div class="DBd2Wb" jsmodel="Qdu94e" data-complete="true" data-processed="true">
<div class="zkL70c" data-processed="true">
<div jsuid="paZN7d_14" class="RkJvxe" jsaction="rcuQ6b:&amp;paZN7d_14|npT2md" jscontroller="RU9mjc" data-sfc-root="c" data-wiz-uids="paZN7d_15" data-sfc-cb="" data-complete="true" data-processed="true">
<div jsuid="paZN7d_16" class="YHsVn" data-sfc-cp="" jsaction="rcuQ6b:&amp;paZN7d_16|npT2md" jscontroller="nqTR2b" data-sfc-root="c" data-wiz-uids="paZN7d_17,paZN7d_18" data-sfc-cb="" data-complete="true" data-processed="true">
<div class="" data-processed="true">
<p>Planned works 19<sup>th</sup> August 2026 (duration 4weeks)</p>
</div>
</div>
</div>
</div>
</div>
</div>
</div>
</div>
</div>
</div>
</div>
</div>
</div>
</div>
<h3>How can I get more information and help?</h3>
<p>The Estates and Facilities Management team member looking after the task is detailed below and can be contacted about any difficulties experienced because of these works.</p>
<p><strong>Name and Job Title</strong>:&nbsp;Tom Dell, Building Fabric Surveyor</p>
<p><strong>Mobile</strong>: 07895331871</p>
<p><strong>Email</strong>: &nbsp;T.Dell@lboro.ac.uk</p>
<p>&nbsp;</p>]]></description>
<link>http://www.lboro.ac.uk/services/fm/campus-works-updates/listing/2026/sir-john-beckwith-brockington-extension--morag-bell---interior-painting.html</link>
<guid isPermaLink="true">http://www.lboro.ac.uk/services/fm/campus-works-updates/listing/2026/sir-john-beckwith-brockington-extension--morag-bell---interior-painting.html</guid>
<pubDate>Fri, 14 Aug 2026 14:20:00 GMT</pubDate>
</item>



<item>
<title><![CDATA[Fire Door Inspection- Multiple Buildings - 13/8/26 to 30/10/26. ]]></title>
<description><![CDATA[<h3>Description of the Works&nbsp;</h3>
<p><strong>WHY DOES THE WORK NEEED TO BE DONE</strong></p>
<p>The work needs to be done to ensure fire safety compliance within university buildings</p>
<p>624 - Energy and Data Hub</p>
<p>206 - Bridgeman Building</p>
<p>210 - NCSEM</p>
<p>216 - Holywell Fitness Centre</p>
<p>217 - WPTH</p>
<p>219 - STEM</p>
<p>224 - Towers Dining</p>
<p>380 - LSU</p>
<p>400 - University House (Imago)</p>
<p>432 - Village Restaurant/Elvyn Dining</p>
<p>467 - Faraday Royce Dining</p>
<p>519 - Cayley Rutherford Dining</p>
<p>625 - William Morris / Student</p>
<p>626 - William Morris Nursery/Learning</p>
<p>&nbsp;</p>
<p><strong>HOW WILL THE WORKS AFFECT ME?</strong></p>
<p>The RLB Contractors will be working in various locations around the building, inspecting fire doors, with most of the work in corridors and staircases. The disruption is expected to be minimal. The contractor has been asked to report to receptions where applicable prior to carrying out the inspections in each building.</p>
<p><strong>Timescale</strong></p>
<div jsuid="zDqeqe_3" class="qJYHHd mp0vvc" data-xid="aim-mars-turn-root" jsmodel="TqqUIc" data-asrc="true">
<div jsname="RH7zg" jsmodel="CPTaDd LUQCCe pRMv2d" data-tr-rsts="false" class="tonYlb Uphzyf" data-sfc-cp="" jsaction="" jscontroller="ZA09ef" data-sfc-root="c" jsuid="zDqeqe_4e" data-wiz-uids="zDqeqe_4f" data-sfc-cb="" data-streaming-container="" eid="f3XXafSwGa2dhbIPk5iesQ0">
<div data-processed="true">
<div class="CKgc1d" data-scope-id="turn" jsname="CS7uPe" jsmodel="p9hQFe CPTaDd LUQCCe wuVnCd pRMv2d" jsaction="" jscontroller="uUCgYd" data-sfc-root="c" jsuid="paZN7d_0" data-sfc-cb="" data-processed="true" data-complete="true">
<div data-subtree="aimc" decode-data-ved="1" data-sfc-cp="" jsaction="" jscontroller="v48bt" data-sfc-root="c" jsuid="paZN7d_2" data-sfc-cb="" data-ved="2ahUKEwi07P2kvuCTAxWtTkEAHROMJ9YQ2O0OegYIAQgAEAA" data-hveid="CAEIABAA" data-processed="true" data-complete="true">
<div jsuid="paZN7d_1" class="Zkbeff" jsaction="rcuQ6b:&amp;paZN7d_1|npT2md" jscontroller="nfCumd" data-sfc-root="c" data-wiz-uids="paZN7d_3" data-sfc-cb="" data-processed="true" data-complete="true">
<div class="pWvJNd" jsaction="" jscontroller="zp3Dsd" data-sfc-root="c" jsuid="paZN7d_4" data-sfc-cb="" data-processed="true" data-complete="true">
<div jsuid="paZN7d_5" dir="ltr" data-container-id="main-col" data-xid="VpUvz" jsname="KFl8ub" class="mZJni Dn7Fzd" jsaction="" jscontroller="Aoijq" data-sfc-root="c" data-sfc-cb="" data-ved="2ahUKEwi07P2kvuCTAxWtTkEAHROMJ9YQ3KYQegYIAQgAEAE" data-processed="true">
<div jsuid="paZN7d_12" data-xid="Gd7Hsc" data-sfc-cp="" jsaction="aimRenderComplete:&amp;paZN7d_12|FJEdde;rcuQ6b:&amp;paZN7d_12|npT2md" jscontroller="a5f0he" data-sfc-root="c" data-sfc-cb="" data-complete="true" data-processed="true">
<div class="DBd2Wb" jsmodel="Qdu94e" data-complete="true" data-processed="true">
<div class="zkL70c" data-processed="true">
<div jsuid="paZN7d_14" class="RkJvxe" jsaction="rcuQ6b:&amp;paZN7d_14|npT2md" jscontroller="RU9mjc" data-sfc-root="c" data-wiz-uids="paZN7d_15" data-sfc-cb="" data-complete="true" data-processed="true">
<div jsuid="paZN7d_16" class="YHsVn" data-sfc-cp="" jsaction="rcuQ6b:&amp;paZN7d_16|npT2md" jscontroller="nqTR2b" data-sfc-root="c" data-wiz-uids="paZN7d_17,paZN7d_18" data-sfc-cb="" data-complete="true" data-processed="true">
<div class="" data-processed="true">
<p>From 13/8/26 to 30/10/26 Fire doors inspections will take place in the buildings above between, 9.00am -5.00pm.</p>
</div>
</div>
</div>
</div>
</div>
</div>
</div>
</div>
</div>
</div>
</div>
</div>
</div>
</div>
<h3>How can I get more information and help?</h3>
<p>The Estates and Facilities Management team member looking after the task is detailed below and can be contacted about any difficulties experienced because of these works.</p>
<p><strong>Name and Job Title</strong>: Rod Harrison - Fire Compliance Contract Supervisor</p>
<p><strong>Mobile</strong>: 07729080155</p>
<p><strong>Email</strong>: &nbsp;<a href="mailto:r.m.harrison@lboro.ac.uk">r.m.harrison@lboro.ac.uk</a></p>
<p>&nbsp;</p>]]></description>
<link>http://www.lboro.ac.uk/services/fm/campus-works-updates/listing/2026/fire-door-inspection--multiple-buildings---13826-to-301026-.html</link>
<guid isPermaLink="true">http://www.lboro.ac.uk/services/fm/campus-works-updates/listing/2026/fire-door-inspection--multiple-buildings---13826-to-301026-.html</guid>
<pubDate>Wed, 12 Aug 2026 10:45:00 GMT</pubDate>
</item>



<item>
<title><![CDATA[Fire Door Inspection- Multiple Buildings - 6/8/26 to 30/10/26. ]]></title>
<description><![CDATA[<h3>Description of the Works&nbsp;</h3>
<p><strong>WHY DOES THE WORK NEEED TO BE DONE</strong></p>
<p>469 &ndash; Royce</p>
<p>053 &ndash; Burleigh Court&nbsp;</p>
<p><strong>HOW WILL THE WORKS AFFECT ME?</strong></p>
<p>The RLB Contractors will be working in various locations around the building, inspecting fire doors, with most of the work in corridors and staircases. The disruption is expected to be minimal. The contractor has been asked to report to receptions where applicable prior to carrying out the inspections in each building.</p>
<p><strong>Timescale</strong></p>
<div jsuid="zDqeqe_3" class="qJYHHd mp0vvc" data-xid="aim-mars-turn-root" jsmodel="TqqUIc" data-asrc="true">
<div jsname="RH7zg" jsmodel="CPTaDd LUQCCe pRMv2d" data-tr-rsts="false" class="tonYlb Uphzyf" data-sfc-cp="" jsaction="" jscontroller="ZA09ef" data-sfc-root="c" jsuid="zDqeqe_4e" data-wiz-uids="zDqeqe_4f" data-sfc-cb="" data-streaming-container="" eid="f3XXafSwGa2dhbIPk5iesQ0">
<div data-processed="true">
<div class="CKgc1d" data-scope-id="turn" jsname="CS7uPe" jsmodel="p9hQFe CPTaDd LUQCCe wuVnCd pRMv2d" jsaction="" jscontroller="uUCgYd" data-sfc-root="c" jsuid="paZN7d_0" data-sfc-cb="" data-processed="true" data-complete="true">
<div data-subtree="aimc" decode-data-ved="1" data-sfc-cp="" jsaction="" jscontroller="v48bt" data-sfc-root="c" jsuid="paZN7d_2" data-sfc-cb="" data-ved="2ahUKEwi07P2kvuCTAxWtTkEAHROMJ9YQ2O0OegYIAQgAEAA" data-hveid="CAEIABAA" data-processed="true" data-complete="true">
<div jsuid="paZN7d_1" class="Zkbeff" jsaction="rcuQ6b:&amp;paZN7d_1|npT2md" jscontroller="nfCumd" data-sfc-root="c" data-wiz-uids="paZN7d_3" data-sfc-cb="" data-processed="true" data-complete="true">
<div class="pWvJNd" jsaction="" jscontroller="zp3Dsd" data-sfc-root="c" jsuid="paZN7d_4" data-sfc-cb="" data-processed="true" data-complete="true">
<div jsuid="paZN7d_5" dir="ltr" data-container-id="main-col" data-xid="VpUvz" jsname="KFl8ub" class="mZJni Dn7Fzd" jsaction="" jscontroller="Aoijq" data-sfc-root="c" data-sfc-cb="" data-ved="2ahUKEwi07P2kvuCTAxWtTkEAHROMJ9YQ3KYQegYIAQgAEAE" data-processed="true">
<div jsuid="paZN7d_12" data-xid="Gd7Hsc" data-sfc-cp="" jsaction="aimRenderComplete:&amp;paZN7d_12|FJEdde;rcuQ6b:&amp;paZN7d_12|npT2md" jscontroller="a5f0he" data-sfc-root="c" data-sfc-cb="" data-complete="true" data-processed="true">
<div class="DBd2Wb" jsmodel="Qdu94e" data-complete="true" data-processed="true">
<div class="zkL70c" data-processed="true">
<div jsuid="paZN7d_14" class="RkJvxe" jsaction="rcuQ6b:&amp;paZN7d_14|npT2md" jscontroller="RU9mjc" data-sfc-root="c" data-wiz-uids="paZN7d_15" data-sfc-cb="" data-complete="true" data-processed="true">
<div jsuid="paZN7d_16" class="YHsVn" data-sfc-cp="" jsaction="rcuQ6b:&amp;paZN7d_16|npT2md" jscontroller="nqTR2b" data-sfc-root="c" data-wiz-uids="paZN7d_17,paZN7d_18" data-sfc-cb="" data-complete="true" data-processed="true">
<div class="" data-processed="true">
<p>From 6/8/26 to 30/10/26 Fire doors inspections will take place in the buildings above between, 9.00am -5.00pm.</p>
</div>
</div>
</div>
</div>
</div>
</div>
</div>
</div>
</div>
</div>
</div>
</div>
</div>
</div>
<h3>How can I get more information and help?</h3>
<p>The Estates and Facilities Management team member looking after the task is detailed below and can be contacted about any difficulties experienced because of these works.</p>
<p><strong>Name and Job Title</strong>: Rod Harrison - Fire Compliance Contract Supervisor</p>
<p><strong>Mobile</strong>: 07729080155</p>
<p><strong>Email</strong>: &nbsp;<a href="mailto:r.m.harrison@lboro.ac.uk">r.m.harrison@lboro.ac.uk</a></p>
<p>&nbsp;</p>]]></description>
<link>http://www.lboro.ac.uk/services/fm/campus-works-updates/listing/2026/fire-door-inspection--multiple-buildings---6826-to-301026-.html</link>
<guid isPermaLink="true">http://www.lboro.ac.uk/services/fm/campus-works-updates/listing/2026/fire-door-inspection--multiple-buildings---6826-to-301026-.html</guid>
<pubDate>Wed, 05 Aug 2026 10:45:00 GMT</pubDate>
</item>





