Description of the Works
The mains water supply serving the FM Male Changing Rooms and Toilets will be isolated to allow the installation of a temporary mains water feed.
This temporary arrangement is required to facilitate the refurbishment of the toilet facilities, which is scheduled to commence the following week, starting Monday 22 June.
The installation of the temporary feed will enable the work area to be bypassed, ensuring that the Joiners’ toilets remain fully operational throughout the duration of the refurbishment.
The canteen will remain open and operational; however, a temporary shutdown of approximately 30 minutes will be required during the switchover.
While the affected toilets are out of service, personnel are requested to use alternative on-site facilities or the toilets located at the FM Help Desk.
TIMESCALE
18/06/26 8.30 a.m. - 5.00 p.m.
How can I get more information and help?
The Estates and Facilities Management team member looking after the task is detailed below and can be contacted about any difficulties experienced because of these works.
Name and Job Title: - Matthew Polkey, Mechanical maintenance manager
Mobile: - 07895331869
Email: - m.polkey@lboro.ac.uk